Client Name
Dredging International
Location:
Abu Dhabi, United Arab Emirates
Duration
2009 - Ongoing
Technology Employed
- gINT Professional Version 8.2
- Datgel Administrator Tools
- Datgel CPT Tool 2
- Datgel Fence and Map Tool 2
- Datgel In Situ Tool
- Datgel Lab Tool
- Datgel Monitoring Tool
- Datgel Output Tool 2
- Datgel Processor Affinity Manager
- Datgel Photo Tool 2
- Datgel Secure Export Tool
- Datgel Security Tool
- Datgel Survey Tools
|
Example magnetic extensometer monitoring report (click for pdf)
|
Project Description
Ruwais Refinery Expansion project involves the reclamation of a 3 km x 3 km area, dredging of a shipping channel, associated quality control testing and settlement monitoring.
Datgel developed the construction phase Geotechnical Data Management System, including
a calculations and reporting system for:
- Materials lab - classification, compaction control, chemical and shear tests
- In situ testing - CPTs, Boreholes, CBR, Density
- Monitoring - Piezometer, Magnetic Extensometer, Rod Settlement Gauge
Phil Wade attended site to install and test the system, and train users.
User documentation was provided, and Datgel will support the system through the
2 year project.
For optimum performance and ease of maintenance the entire system is installed on
a Terminal Server, and both contractor and client users access the system via TS. The
Secure Export Tool automatically makes newly approved data available to the client each night.
|